Monthly Archives: April 2016

Walk 2: Peckham Rye walk to Rotherhithe

Walk 2: PECKHAM RYE walk to ROTHERHITHE 1 3/4 hours The train line opened in 1866 between Peckham Rye and a junction in Bermondsey with the main line to Kent. The section between the junction and Surrey Quays opened in … Continue reading

Posted in London Overground | Leave a comment

Walk 1: Clapham Junction walk to Peckham Rye

Walk 1: CLAPHAM JUNCTION walk to PECKHAM RYE 3 1/4 hours The train line between Clapham Junction and Wandsworth Road was opened by London Overground in 2012 but it combines the 1862 line from Victoria train terminal to Kent with … Continue reading

Posted in London Overground | Leave a comment

Walk 5: Carpenders Park walk to Watford Junction

Walk 5: CARPENDERS PARK walk to WATFORD JUNCTION 1 1/2 hour The train line opened in 1838 as part of a long-distance connection between London and Birmingham and this line runs in a straight line. Because of congestion issues, an … Continue reading

Posted in Euston network | Leave a comment

Walk 4: Harrow & Wealdstone walk to Carpenders Park

Walk 4 HARROW & WEALDSTONE walk to CARPENDERS PARK 2 hours The train line opened in 1838 as part of a long-distance connection between London and Birmingham. Because of congestion issues, an additional set of tracks was built in 1879. … Continue reading

Posted in Euston network | Leave a comment